Upper section 3m, Hot-Dip Galvanizing 180 tower
        3 m upper section for the erection of a 180 tower.
    
    
    
 Ref. 303201 
                            
                    
    
  
            
    
    
    EAN13: 
        8424450152218
    
    
    
        
    
  
    SKU    
303201
Highlights
- Anchoring system with union nuts
 - Easy and quick mounting
 - Fully automated soldering
 - 180 tower maximum height: 26.5 m (as per calculation conditions)
 - The hot-dip galvanizing surface treatment provides enhanced durability in adverse corrosion conditions
 - Grey finish
 - Mast max. diameter: 46 mm
 - Main tubes of 20*2 mm and transverse rods of 6 mm
 
| Surface facing the wind | m² | 0.272 | 
|---|
Physical data
Net weight: 11,559 g
Gross weight: 11,559 g
Width: 225 mm
Height: 3,010 mm
Depth: 225 mm
Main product weight: 11,559 g
Packing
Unit 1 Units
| tlv_reflog | TOBER180FV | |||
|---|---|---|---|---|
| tlv_tabla_especificaciones | 
  | 
                |||
| tlv_ean | 8424450152218 | |||
| tlv_dim_product_x | 225 | |||
| tlv_dim_product_x_label | Width | |||
| tlv_dim_product_x_unit | mm | |||
| tlv_dim_product_y | 3,010 | |||
| tlv_dim_product_y_label | Height | |||
| tlv_dim_product_y_unit | mm | |||
| tlv_dim_product_z | 225 | |||
| tlv_dim_product_z_label | Depth | |||
| tlv_dim_product_z_unit | mm | |||
| tlv_weight_product_label | Main product weight | |||
| tlv_weight_product | 11,559 | |||
| tlv_weight_product_unit | g | |||
| tlv_gross_weight_label | Gross weight | |||
| tlv_gross_weight | 11,559 | |||
| tlv_gross_weight_unit | g | |||
| tlv_net_weight_label | Net weight | |||
| tlv_net_weight_unit | g | |||
| tlv_net_weight | 11,559 | |||
| tlv_1_type_pack | Unit | |||
| tlv_1_type_pcs_pack | Units | |||
| tlv_1_pcs_pack | 1 | 
Mounting details
                               
                                       
                    It consists in fixing the lower section to the base, set it in upright 
position and levelling it. The subsequent Middle Sections are then 
mounted, equipped with the appropriate guy wires; the mounting is 
carried out by climbing on the previously mounted sections and hoisting 
the new section with the help of the appropriate lifting tools.